Saturday, March 9, 2024

Paying Tribute to Glen Hammond

Paying Tribute to Glen Hammond 

In a recent e-mail Fred wrote the following with regard to the construction of the new depot to be located in Glen Hammond. 

"It is nice to see so many great people, all contributing to the total success of the GLEN HAMMOND station project.  Thank you all, for putting up with my desire to “light the station” and make it a great night feature, along with a day time model of a wonderful station, honouring my old friend and neighbour “Charlie Hammond” who was Bob Craig’s Uncle."

Fred continues, "Bob Craig, C.R.Craig was a founding member of the Ottawa Valley Associated Railroaders, a wonderful friend of so many, and a true promoter of FRIENDSHIP and Model Railroading…along with OPERATIONS." 

"The CR Craig Memorial Library is named to honour him, and his dedication to sharing and caring….total friendship, and a hobby that brings us all together."


We bid farewell with a tear in our eye to our wonderful Glen Hammond Station which has stood us in great stead for many a decade!


She witnessed many a meet of freight trains from both roads.


And...passenger trains with local freights.


She helped organize meets of two passenger runs as well!


Friends from near and far were able to enjoy the stone depot just as we were every Saturday.


Indeed, she will be missed greatly!


This blog entry honours the life of our beloved Glen Hammond Depot and we examine the history of the name of the location which has seen two spellings over the years.


From an operations perspective, Glen Hammond is the departure point of our two centrally located trains (trains 303 and 304) which are staged here before the session.


The crews for these runs may have work to conduct in the Glen before heading out on their respective journeys.


Two staging tracks combine with two interchange tracks here.


The power for the far train will haul its consist eastward to Craig Leigh while the caboose on the next track will trail its train westward to Firgrove.


RP&M crews work the small yard in Glen Hammond while some IPP&W wayfreights simply depart the yard (after possibly working the interchange tracks) at the beginning of the session and some terminate here at the end of the session.


The yard at Glen Hammond sits adjacent to its bigger brother, Nelson Yard.  Chris in the distance was instrumental in creating the windows and doors for the new depot which will replace our venerated stone structure.


This scene is from the perspective of the dispatcher who resides (sometimes) in the dispatch booth which towers over the depot location.


Check the proximity of the depot to the dispatcher's hut.


Skipper Bernie takes a break from operations to watch the action.  Bernie was one of the dedicated team members helping out and photographing the work accomplished on the Wednesdays as the new station materialized.


H-e-r-e-'s Bill!  Bill was an instrumental fabricator of the new station as well!  Some of the work sessions tool place at his home.


In the distance we see Steve & Seanna approaching the depot with their westbound passenger run.  Steve & Seanna will play a hand in the lighting of the station.


With the ore train departing the Glen, this must mean that Bob is "in the house".


Bob will play a role in ensuring an electrical source can be connected between the dispatch booth and the new depot.


George was helpful in creating the roof for the new structure.


Here's Doug.  He played a key role in the building of the new depot in working with the crew and documenting the many stages involved.  We catch him working the house track with some headend equipment being moved about on the Pool Train.


The house track runs in behind the station in the Glen.


Meanwhile, our other Doug painstakingly cut all the batten boards for the new station!


As Father Fred stated earlier, Glen Hammond is named for his backyard neighbour, Charlie Hammond.


The station always enjoyed our "Invasion Weekends" where it got to meet new faces!


Fred tells us...
"My backyard neighbour, Charlie, was like a "second father" to me."


The western approach to the Glen sees trains taking the big curve which runs from the north to an easterly tack into the yard.


As we spot a meet between two passenger trains, Fred continues his story...
"When Charlie Hammond passed away Fred tells us that he inherited Charlie's Buick Le Sabre."
 While we now know how much Charlie meant to Fred, the feelings were obviously reciprocal.


Being an eastbound with no headend equipment, this must be Passenger 2.


We spot a meet in front of the depot.


Fred continues with his story...
"One day Bob Craig came over to the house to check out the trains."


"Charlie Hammond popped in to visit from his yard which shared the low chain link fence with mine."


A different day with a different train.  Fred goes on...
"Bob and Charlie got to talking as if they have known each other for years!"


The above image shows Johnny Chuff Chuff "passing through" with an RP&M wayfreight.


Fred continues...
"I asked Charlie and Bob what it is that they have in common seeing as they seem to be conversing on a wavelength which tells me that they have known each other for years."


Bob Craig responds to Fred's question, 
"Charlie Hammond is my uncle!"  
Fred can't believe the chances of Charlie Hammond (his backyard neighbour) being the uncle to Bob Craig!


This past season we have been deliberately running Passenger 2 and Passenger 1 simultaneously.


The station at Glen Hammond has been listed as the designated "meet location"


It has amazed us at how close in time the two crews arrive - literally within mere moments of each other.


With the meet "met" the two crews will be on their merry way!


The third passenger run, the Pool Train, spends a longer time in the Glen as it conducts its work at the team track in behind the station as we saw earlier.


In this image from a few years ago, we see a "caboose hop" passing by as the Pool Train gets down to work.


An RP&M locomotive runs past on the far station track as a number of cars reside in behind the station.


One of the headend cars on the house track.


Bruce arrives Glen Hammond during an "Invasion Weekend" session.


The view from my dispatch hut moments before sees the passenger train running around an RP&M wayfreight with eyes on the station.


Another approach from the west.


Pat brings the train into the station as RP&M crews keep busy in the yard in the Glen.


An RP&M freight bypasses Nelson Yard due to congestion in the big yard, preferring to take a wider berth along Glen Hammond trackage.


The freight stays "out of the way" on the far track from the yard leads.


Another early morning shot with different power.


Each week is unique from the previous one as we alternate between steam and diesel/narrow gauge and standard gauge sessions.


On another day the house track sees action once again.


Two cars are spotted there.


Some will be exchanged.


Another meet carefully choreographed this past season.


Both trains arrived within a minute or two of each other once as is the goal.


Dispatching the operations is a ton of fun for Doug, Bill and me!


On a day many years ago before the wooden fence was installed between Fred's and Charlie's older property, Doug has arrived the Glen with Pool Train 33.


He uncouples his headend equipment from his train.


He deposits two cars in on the house track.


Pulling ahead.


In short order Doug will be back on his train and heading further west where he will divert from the IPP&W at Bell and head onto RP&M iron bound for Rat Portage before returning to home rails.


Let's take one last look at another scheduled meet in front of our dear depot.


Vintage equipment make for a colourful scene.


Garry and Robin will enjoy the camaraderie of running the Pool Train together later on, but first they must separate as a crew in order to run Passenger 1 and 2 independently where they will meet in the Glen.


We spot Nelson Yard rather empty to the right.  Passenger 2 faces us while Passenger 1 is the "going away" train.


Garry's power on Passenger 2.


Here are the two handsome lads.


Mark runs Marcel's Rail Diesel car into the Glen.


Looking good there Mark...


...and Marcel too.


As mentioned many times...different days showcase different diesels...and steamers too!


Here I am working the yard in the Glen with the larger Nelson Yard off to the left on a day a don't take on the role of dispatcher.


And...that's Bell off to the right.


Now, we will switch to a few video segments.


In the following video we will witness the departure of  eastbound Train 304 as westbound 303 continues its work in Glen Hammond before departing.


Video of 303's departure out from the Glen.


Pool Train 33 makes an appearance outside Nelson Yard.


Train 33 arrives the Glen from the east as seen in this video effort.


Train 304 continues with its switching work in Glen Hammond.


Action at the western throat of Nelson Yard captured on video as 304 works the Glen.


As dispatcher I am holding Pool Train 33 at the station momentarily as the Nelson Yard crew clear the western throat of the yard to allow a westbound IPP&W train to enter the yard.


Listen in on my holding directive caught on audio in this video.


IPP&W westbound 301 is now cleared to enter the yard.


301 is found on video as it enters Nelson Yard and clears the turnout for the Pool Train wanting out of Glen Hammond.


301's entrance as followed by Mike's video camera.


Pool Train 33 rolls on out!


Train 33's "escape" is captured on "police" video!  
Pardon the singing here!  The lads were saying that it can be a heartache waiting for entrance into Nelson Yard - thus the attempt at singing the Bonnie Tyler song! 


The view from my perch inside the dispatch centre through the dirty windows.


Video action in Glen Hammond and at Bell as captured from my perch inside the dispatch control area.


On a different day we find one of the staged Glen Hammond trains gone while the other finishes up its work as an RP&M train enters the fray in the Glen.


RP&M and IPP&W crews meet in this video taken in the Glen.


The western sector of the railroad known as the Bell Sub is a busy place at the moment.


The crew aboard 304 seek clearance from dispatch in this video where two other crews also contact dispatch in order to gain permission to move along the line.


Moe follows his train, Passenger 2, around the big curve on entry to Glen Hammond where he will meet his counterpart train.


The meet of our two passenger trains is brought to you in this video.


Gerry handles the opposing passenger run, Number 1.


Continued video of the meet.


Number 2 departs town.


Departure of Train Number 2 on video.


Much later in the session the two lads join together as a team to run the Pool Train, number 33.


The later occurring Pool Train video.


Chris crews for the RP&M this day and he terminates his train here in the Glen.


Glen Hammond RP&M video reels along with a glance over to Bell along the IPP&W.


It's been fun for me in creating this tribute to Glen Hammond on our IPP&W/RP&M Rwy.


Fred looks on as the Glen looks vacant at the moment during a session many seasons ago.

We thank Fred for being so inviting and welcoming!

I have many more images and videos taken in and around Glen Hammond which I will be able to share with you during future blog entries.

All the best, Fred & the members of the OVGRS
Ottawa, Ontario, Canada

Thursday, March 7, 2024

Glen Hammond Depot Reaches (Near) Completion

Doug sent me his recent update on the workings of the WDWD crew this past week.

What follows is his accounting of the events.

On Wednesday, March 6 we gathered in the IPP&W shops to complete our winter work on the Glen Hammond station.  In a bit of a misadventure, Bernie delivered a piece of new roof cap George had prepared but it did not quite match the short piece we had on hand.  Fred managed to get a new piece cut on short notice to meet the need. 

Bill and I joined Fred in the shop early in the morning.  Fred had the fire stoked in the wood stove making the shop quite warm and welcoming for work.

We were joined shortly after by Chris who brought the windows and doors for the station and Chris set to work inserting the glazing.



Bernie also joined us and Bernie and I took the pics for this write-up of the day's efforts.

Here was our starting position - the station neatly roofed with a heavy 22 gauge steel roof.  The roof cap was set in its place for the picture but was not fastened (yet).

First the roof cap was cut to length - Bill did the honours with the hacksaw.  Watch your fingers, Bill!  🙈

 Then a bead of silicone caulking was applied to the roof cap.

The roof cap was carefully positioned and held for a moment till the caulking gripped it tight.

With the roof completed there was still a need to seal the edges of the plywood roof underlay.  We had found in previous repair work on other buildings that rainwater tended to creep by capillary action under the roof against the underlay.  The edges were sealed with a bead of caulking.

The roof was replaced on the station and finally...windows!  "Hot-glue Bill" fired up the glue gun and applied some glue on each side before pressing the windows into place.


The windows and doors were all inserted.  The station looked pretty sharp!


One last task remained.  The station walls required sealing where they meet the base.  Bill used hot glue for this sealing job.


And with that, the winter work was completed.  A pair of happy campers!


And...the final product for the day.

The station is now set aside till spring.  A warm day in April will allow us to completely finish - the roof needs two coats of paint (jade green), the gable ends need to be installed along with the train order signal and signage.  Lastly the base needs a second coat of paint and there is a bit of touchup yellow to be attended to.

This was a team effort.  While Bill and I took the lead in designing and constructing, without the help of many others it would not have been possible.  Bernie was there at every step of the way and lent a helping hand throughout.  Fred not only supervised and kept the shop warm, he also did the tedious job of cutting accurately all the door and window openings.  Doug C. risked his fingers cutting miles of battens for the walls.  Chris 3D printed the gable ends as well as the marvellous doors and windows.  George skillfully cut that heavy roof out of sheet steel.  Still to come is some wiring for lighting and Seanna and Steve have been conscripted to help us out in that regard.  Thanks to everyone who played a part in bringing the new Glen Hammond station to life. 

Thanks, Doug & all the gang involved!  Your finely detailed efforts will benefit our train operations with a lovely depot for our passenger and pool trains to visit and for others to view with admiration!

The WDWD crew of the OVGRS, 

Ottawa, Ontario, Canada

Monday, March 4, 2024

Mark's Pics From George's Sunday Session

Running Trains with Mark & Leo at George's

I received this lovely e-mail from Mark today showcasing his adventures with son, Leo, at George's over the weekend.

Below is Mark's message my way.

Hi Mike,  Hard to believe that just a week ago the Canal was still open for skating (though, arguably on its “last legs” for the season). Yesterday was a beautiful, mild “spring” day for the first weekend of March - a harbinger of warm days to come. At their weekly get-together, George and Len had the wonderful idea of opening up the outdoor portion of their layout for the inaugural “full-scale” operation session of 2024.

I was very lucky to witness it all with Leo. Here’s our story.


Leo and I arrived to see preparations for the session in full swing. Here Len’s handsome CP Rail RS3 maneuvers a string of vans to be used for running trains during the session.


Skies are grey but hope springs eternal. Before the “opening bell”, George arrived with a smile on his face and a bright idea in his head - let’s open up the garage doors for today we run outside! 

Len and George skillfully disassembled the protective outer plywood layer that shields the opening garage door from the fierce winter storms that frequent the Ottawa valley.


The beautiful trestle joins the twin worlds of indoor and outdoor and its laying down yesterday represents the dawn of a new era: outdoor running in 2024! 

Len’s GP30 eagerly awaits its mission to deliver this string of ore cars down the line. It is chomping at the bit as it hasn’t ventured to the great outdoors since 2023! 

Folks, this picture truly represents the “light at the end of the tunnel.” Spring is here!


Leo was impatient to “clear the tracks” from the scourge of winter, picking up debris, clearing and testing the switches and so on. 

He loaded his maintenance-of-way (MOW) vehicle fleet (toy excavators, flat bed, steam roller) into a gondola pulled by George’s clever red 25-ton switcher. 

 Thanks, Leo, for all your help!


The busy crew prepares to unload to inspect the yard.


I think Leo had the most fun out of everybody yesterday. 


Leo is all smiles as the MOW train heads back up the line, its mission complete.


The gondola also serves to collect any stray debris lying on the track that might otherwise foul up the line. Here Leo is reaching up to fill the car.

The grass and leaves dwarf the busy machines in the gondola, but our job is done. 

This is a true transition photo - that last pile of snow by the barn will be mostly gone by next week I predict, and we can all look forward to a wonderful 2024 operating season in the great outdoors, whether at Fred’s or George’s place or wherever our trains take us. 

Happy spring, everyone, and see you soon! 

Thanks Mark for sending along this wonderful photo essay.  Looks like fun was had by all!


In other news, OVGRS member, Kris, has shared with me a video where he goes over the latest development on his growing HO scale model railroad...the bridge scene.


Kris tells us that he has been inspired by this span located in Cleveland.


The section you see above is the first portion of his build.  A few more spans will be required to complete the full length of his bridge.


In between working on the layout with his young son, Kris finds time to run a train.

To view Kris's video, simply copy and paste the link below into your computer's browser.

https://www.youtube.com/watch?v=bD66IQemF6U

Thanks Kris & Mark for offering up some great pics and stories for our friends to enjoy!

All the best as we make our way through a balmy month of March - so far!

We are the OVGRS of Ottawa, Ontario, Canada

Friday, March 1, 2024

Latest Workday Wednesday Accomplishments On Glen Hammond Depot

Our Glen Hammond Depot Moves Along

We have some more news on the Glen Hammond Depot as shared my way via Doug's text and Bernie's photos.

We thank, Bill, George, Doug, Bernie, Fred & others who have contributed to this project for their dedication and efforts in building a new station for Glen Hammond which will benefit us all.

Here is their story from this past week.

On Sunday, Feb 25, Bill Scobie took the station to George Wellington's shop.  George is a highly skilled machinist (a millright by trade) with a very well equipped shop.  George graciously agreed to fabricate a metal roof for the Glen Hammond station.  Bill worked with George on the required roofing and took a few pictures.

Here is George in his workshop

George used a sheet of 22 gauge steel to cut the roof and associated parts - this roof won't easily blow off!

The main station roof was completed.

The ops bay metal was cut using the plywood underlay as a pattern

On Wednesday, February 28, Bill, Bernie and I joined Fred in the IPP&W shops to continue work on the station roof.  

Bill brought the station back along with the steel components that George had fabricated.  Here is the starting point - the station with the bare plywood sub roof.

Fred was the fire stoker of the old wood stove to keep us warm


         Bernie came in and he and I took pics as the work progressed.

First task was to wipe down the inside of the steel roof with lacquer thinner to remove any dust and grease

Once the surface was thoroughly cleaned contact cement was painted on both the plywood sub roof and the steel roofing material

We got a little impatient waiting for the contact cement to dry and attempted to hurry it with some heat from the wood stove.  It didn't work - some things just take time!

Once the contact cement had dried, the main roof was carefully put in place and after being positioned, pressed down tight.

Next, the ops bay subroof was fastened in place.  Where wood touched wood some Titebond III was used but the hot glue gun came out to secure the wood to the steel roof.


                 Here is the station with the ops bay sub roof installed.

The steel ops bay roof was put in place using the same process as the main roof - wiping with lacquer thinner followed by contact cement and careful placement.

The station roofing was completed but valleys and caulking were still required to prevent leaks just as the real roof would have.


The flashing for the first valley of the operator's bay was measured and cut.

The first valley flashing is positioned and held in place.

The second valley was carefully measured.

The second valley required some extra trimming to get a good fit - the geometry is a little tricky.

And then the second valley was put in place with silicone sealant to prevent water leaks. 

Sometimes a big hammer helps!  Installing the bay roof cap.

With the steel roof completed (except for the roof cap on the main roof), the base was painted.

The station was set aside for drying

George was contacted while we finished up the work on Wednesday and he agreed to cut one more steel piece for the roof cap the length of the roof.  There are no gaps in the steel roof so the cap is just for show.  

It is anticipated that we will be back in the shop on March 13 to install the roof cap, finish installing windows and to run a bead of sealant around the base of the station as well as seal the edge of the plywood sub roof.

Painting of the roof will be done outside once spring arrives along with final details such as the gable ends, train order signal and the name signs to name a few.

Thanks to all the lads involved.  It brings us great joy to follow your phenomenal developments showcasing such skillful modelling abilities!

All the best to everyone out there on this first day of March!

The Workday Wednesday Crew of the OVGRS

Ottawa, Ontario, Canada